Hotel estates and buildings

PROJECTS,PERFORMED BY THE COMPANY “RAF ENGINEERING” Ltd

 

9. Hotel and casino International, k.k. Golden Sands, Varna

1.1. Assignor: "Planex" Ltd
1.2. Year: 2022 - 2023
1.3. Performed activities:
- repair works - high voltage installation
   
 8. Hotel & SPA“Azalia”, „St. st. Konstantin and Elena″, Varna multicipality

1.1 Assignor: “Planex” Ltd.
1.2 Year: 2020 
1.3 Performed activities:
- high voltage kitchen installation
- facade lihting and helicopter pad

Gallery    
   
 7. Hotel complex “Sunrise Blue Magic Resort”

1.1 Assignor: “Komfort” Ltd.
1.2 Year: 2018
1.3 Total built-up area: 18 500 m2
1.4 Performed activities:
-external power supply
-backup power supply from diesel generator
-street lighting
-park lighting
- high voltage installation
– lighting and sockets;
- lightning protection and grounding system;
-intercom installation
- computer (internet) installation;
- telephone installation;
- television (TV) installation;
- security system;
- fire-alarm system;
- access control;
- sound announcing installation;
-video surveillance
 

Gallery    
   
 6. Thermal complex “Aqua House Thermal & Beach”, “St. st. Konstantin and Elena”,Varna multicipality

1.1 Assignor: “Komfort” Ltd.
1.2 Year: 2017
1.3 Total built-up area: 5 800 m2
1.4 Performed activities:
-backup power supply from diesel generator
- high voltage installation
– lighting and sockets;
- lightning protection and grounding system;
- computer (internet) installation;
- telephone installation;
- television (TV) installation;
- security system;
- fire-alarm system;
- access control;
- sound announcing installation;
 

Gallery    
   

 5. Hotel „ODESOS”, „St.St.Konstantin and Elena”,Varna

1.1 Assignor: “Komfort” Ltd.
1.2 Year: 2015
1.3 Total built-up area: 2 300 m2-level „0”
1.4 Performed activities:
- grounding system ;

 

 

 


Gallery 
   

 4. Complex of resort buildings with Spa center, restaurants and swimming pools, “FORTES HILLS” , Fish-Fish countryside, Balchik Multicipality – unfinished

1.1 Assignor: “Komfort” Ltd.
1.2 Year: 2014-2019
1.3 Total built-up area: 32 000 m2
1.4 Performed activities:
- high voltage installation
– lighting and sockets;
- lightning protection and grounding system ;
- intercom system;
- computer (internet) installation;
- telephone installation;
- television (TV) installation;

 

 


Gallery 
   
 3. Hotel complex with underground parking – two levels, conference room, lounge and bar “ASTERA”, “Golden sands” resort,Varna

1.1 Assignor: “Komfort” Ltd.
1.2 Year: 2012
1.3 Total built-up area: 7 000 m2
1.4 Performed activities:
- reserve power Diesel-Generator
- park lighting;
- high voltage installation
– lighting and sockets;
- lightning protection and grounding system ;

 

 


Gallery  
   
 2. Hotel complex “MADARA”, “Golden sands” resort,Varna-extention

1.1 Assignor: “Komfort” Ltd.
1.2 Year: 2012
1.3 Total built-up area: 1 020 m2
1.4 Performed activities:
- high voltage installation
– lighting and sockets;
- lightning protection and grounding system ;
- intercom system;
- computer (internet) installation;
- telephone installation;
- television (TV) installation;
- security system;
- fire-alarm system;
- access control;
- video surveillance;
 

Gallery    
   
 1. Apart hotel complex with underground parkings, swimming pools, restaurants, bars and Spa center “SUNRISE” all suits resort, Obzor town, Nesebar Multicipality

1.1 Assignor: “Komfort” Ltd.
1.2 Year: 2009-2015
1.3 Total built-up area: 34 200 m2
1.4 Performed activities:
- external power supply
- reserve power Diesel-Generator
- street light;
- park lighting;
- high voltage installation
– lighting and sockets;
- lightning protection and grounding system ;
- intercom system;
- computer (internet) installation;
- telephone installation;
- television (TV) installation;
- security system;
- fire-alarm system;
- access control;
- video surveillance;
- speaker-warning system;
 

Gallery 
   
   
   
   

Gallery

Notices

If you want to subscribe for our news, kindly enter your e-mail address here below.